Home

About Us

References

Unit Conversion Utility

Contact Us

 

Marine

Pier and Pile Repair

Sheetpile Shoring and Cofferdams

Underwater Inspection and Repair

Pipelines and Structures

 

Foundations

Underpinning

Shoring

Tiebacks

Shotcrete

 

Structures

Bridges

Tanks

Heavy Equipment Foundations

Retaining Walls

 

Flood & Erosion Control

Rip Rap - Rock, Gabbions

Concrete Lining

Slope Repairs

Rock Slope Netting and Bolting

 

Machinery and Piping

Pump Stations

Water and Wastewater Treatment

Heavy Equipment Installation

PEC LOGIN

 

 


Project Name:
 Bel Marin Keys

Location: Navato, California

Owner: Bel Marin Keys Community Services District

Description of Project, Scope of Work Performed:

This project consisted of the modification of two lock structures within a narrow environmental window as a steelhead mitigation measure. Work included design, fabrication, and installation of automated fish intake and discharge screens under NOAA supervision, installation of automated flood control valves, raising the height of the lagoon radial arm gates, increasing the height of the navigation lock doors, and miscellaneous repairs to the adjacent flood walls and levees.

 

 