Home

About Us

References

Unit Conversion Utility

Contact Us

 

Marine

Pier and Pile Repair

Sheetpile Shoring and Cofferdams

Underwater Inspection and Repair

Pipelines and Structures

 

Foundations

Underpinning

Shoring

Tiebacks

Shotcrete

 

Structures

Bridges

Tanks

Heavy Equipment Foundations

Retaining Walls

 

Flood & Erosion Control

Rip Rap - Rock, Gabbions

Concrete Lining

Slope Repairs

Rock Slope Netting and Bolting

 

Machinery and Piping

Pump Stations

Water and Wastewater Treatment

Heavy Equipment Installation

PEC LOGIN

 

 


Project Name:
 
Carquinez Bridge Temporary Trestle

Location: Carquinez, California

Owner: California Department of Transportation (Caltrans)

Description of Project, Scope of Work Performed:

Power Engineering Contractors drove 24” steel piles to construct  a timber access causeway for the construction of the new Carquinez Bridge.  Power Engineering worked in the currents and shipping traffic of the Carquinez Strait.  Also, we coordinated our daily operations with the Coast Guard.  Power Engineering used our own barge, tug and crane to perform the work.  The work was completed in a sensitive fish spawning area necessitating a rigorous schedule to avoid $10K per day liquidated damages if the project ran over.

 

  

 