Home

About Us

References

Unit Conversion Utility

Contact Us

 

Marine

Pier and Pile Repair

Sheetpile Shoring and Cofferdams

Underwater Inspection and Repair

Pipelines and Structures

 

Foundations

Underpinning

Shoring

Tiebacks

Shotcrete

 

Structures

Bridges

Tanks

Heavy Equipment Foundations

Retaining Walls

 

Flood & Erosion Control

Rip Rap - Rock, Gabbions

Concrete Lining

Slope Repairs

Rock Slope Netting and Bolting

 

Machinery and Piping

Pump Stations

Water and Wastewater Treatment

Heavy Equipment Installation

PEC LOGIN

 

 


Project Name:
SBSA Effluent Outfall Repair/Replacement Project                     

Location: 1400 Radio Road, Redwood City, California  94065

Owner: South Bayside System Authority

Description of Project, Scope of Work Performed:

Replace a segment of an existing concrete outfall with a polyethylene pipe.  The replacement section runs through bay wetland and will be replaced while the forcemain remains active.  Work consists of constructing a 17’ x 235’ steel sheet pile cofferdam with bracing, in bay mud over the existing outfall.  The cofferdam is constructed with 50 – 55 foot az18 sheets.  Later phases of the project include excavation, removal of the existing RCP pipe, and installation of a new polyethylene pipe using divers, backfill and removal of the cofferdam. 

 

 