Home

About Us

References

Unit Conversion Utility

Contact Us

 

Marine

Pier and Pile Repair

Sheetpile Shoring and Cofferdams

Underwater Inspection and Repair

Pipelines and Structures

 

Foundations

Underpinning

Shoring

Tiebacks

Shotcrete

 

Structures

Bridges

Tanks

Heavy Equipment Foundations

Retaining Walls

 

Flood & Erosion Control

Rip Rap - Rock, Gabbions

Concrete Lining

Slope Repairs

Rock Slope Netting and Bolting

 

Machinery and Piping

Pump Stations

Water and Wastewater Treatment

Heavy Equipment Installation

PEC LOGIN

 

 


Project Name:
 Stanford Golf Course Bridges #3 and #4

Location: Stanford, CA

Owner: Stanford Management Company

Description of Project, Scope of Work Performed:

This project involves the structural analysis of two existing golf cart bridges, value analysis to determine the most cost effective repair, replacement and layout options, permitting, design and construction of new bridge footings, and installation of prefabricated bridges.  Both bridges are in excess of 120 feet long.

 

  

 

Copyright ©2008 Power Engineering Contractors. All Rights Reserved.